Session 4 - Lessons learned " The Good, The Bad and The Ugly "

How has digital engineering in a mining project been enhanced through the use of advanced work packaging (AWP), building information modeling (BIM), and geographic information systems (GIS), enabling a 5% cost reduction and a 20% increase in productivity?

4 views
FD
Flavio Dayrell EY
GC
Guilherme Castro EY

Published in Capital Projects Symposium 2024
Publisher X-CD Journal
Date of Conference November 3–5, 2024
KEYNOTE : Beating the odds in mining project delivery – a third faster and cheaper by embracing AI and Innovation P. Pikul · N. Walgama
How has digital engineering in a mining project been enhanced through the use of advanced work packaging (AWP), building information modeling (BIM), and geographic information systems (GIS), enabling a 5% cost reduction and a 20% increase in productivity? F. Dayrell · G. Castro
Delivering successful Mining Projects in Brazil J. Zanon
Delays and Cost Overruns on Major Mining Projects: Managing Risks and Mitigating Consequences J. SHERRETT
Industry Self-Reflection - Are Lessons Being Learned? K. Murray