Abstract
This presentation will discuss the advancements in digital engineering within a mining project, specifically through the integration of Advanced Work Packaging (AWP), Building Information Modeling (BIM), and Geographic Information Systems (GIS). These technologies have enabled a 5% reduction in costs and a 20% increase in productivity. Drawing on a specific case study, this session will highlight how these innovations optimize workflows, enhance collaboration, and improve project planning efficiency, offering key takeaways for industry professionals seeking to implement similar strategies.