Title: Resource Model to Mined Value: Integrating Digging and Blast Movement Effects in Early Mine Planning at a Kinross Operation.
Authors: Luiz Cadaxa; Melchior du Cluzeau; Igor Vargas; Jacob Brown; Bruna Canesso; Enzo Angeles.
Affiliations: Orica and Kinross Gold Corporation.
Contact: luiz.cadaxa@orica.com; melchior.ducluzeau@orica.com; ;Igor.Vargas@Kinross.com; Jacob.Brown@kinross.com; bruna.canesso@orica.com; enzo.angeles@orica.com
In the early stages of a mining project, one of the most critical tasks is the quantification of mineral resources through robust geological modelling and reliable resource estimation methods. While the total resources and reserves provide an initial indication of project potential, this metric alone does not capture economic viability if mining, processing, and environmental constraints are not adequately integrated. Consequently, mineral resource evaluation increasingly requires collaboration across disciplines, including geology, mining planning, and blasting engineering, to ensure that early-stage assessments reflect realistic operational conditions.
Resource and reserve calculations provide sound estimations of tonnage and grade, and the integration of preliminary cost assumptions is applied to approximate net project value. In deposits with significant geometric anisotropy, however, the material is delineated and mined using polygons that incorporate degrees of ore loss and dilution that can have a non-negligible impact on the planned value. And while block model re-blocking can convey a planned dilution, this underscores the need to calculate digging-related ore dilution/loss on a phase-by-phase basis and using site-specific operational parameters to obtain more accurate and expected results.
Mineral resources hosted in in-situ rock generally require drill-and-blast excavation, positioning blasting as the first fragmentation stage in the mining value chain. Within this interdisciplinary framework, the effect of blast movement on value is a critical yet frequently overlooked phenomenon, especially at the mine planning stage. Collaborative interaction between geologists and blasting engineers enables a clearer understanding of how blast design and execution influence ore dilution, loss, and material classification. These outcomes are strongly influenced by blast design factors (e.g., delay timing pattern, powder factor) and face conditions (e.g., free, choked, and fully confined), which, in turn, have downstream impacts on resource reconciliation and mine-to-mill performance.
This paper proposes the integration of digging parameters and blasting-related criteria into mineral resource value assessment through a collaborative workflow linking geological modelling, mine planning, and blast engineering using data from a Kinross site. The methodology involves the use of two algorithms: firstly, a dig polygon optimizer to generate optimized dig polygons on a resource model; and secondly, a blast movement prediction algorithm to generate moved block models and calculate induced ore dilution and loss. The study will use fixed site-specific parameters (available shovels, mining costs, metal recovery) and evaluate different sets of selectivity scenarios (SMU size, dig direction parameters) to define optimal operational strategies based on ore loss, dilution, and net value. In parallel, a localized assessment will quantify the effects of post-blast conditions on dilution, ore loss, and material misclassification. This interdisciplinary approach demonstrates how collaboration improves the realism and reliability of resource valuation in early-stage mine planning.