Geologic uncertainty in narrow vein gold deposits arises from both uncertainty in continuous grade variables and uncertainty in vein geometry. In underground mining where development and extraction costs are high, geometric uncertainty can have a significant influence on production performance. This presents a workflow for quantifying uncertainty in production stopes at the Wesdome Kiena Mine using a tabular simulation approach. Vein top and bottom position, thickness, and lateral extents are simulated to capture geometric variability, followed by simulation of gold grade within each realization of the vein geometry. Two uncertainty cases are evaluated: (1) pessimistic uncertainty, assuming a fixed stope design; and (2) information-effect–adjusted uncertainty, which accounts for future data that will be available during mining. While the pessimistic case tends to overstate uncertainty, the adjusted case provides a more realistic characterization. Two approaches are considered to assess information-effect–adjusted uncertainty: (1) modifying the stope geometry such that the vein is always intersected (a proxy for future information), yielding optimistic uncertainty; and (2) a more complete resample and re-estimation workflow that considers synthetic future production data and redesigning the stope shape, yielding realistic uncertainty. Relative to the realistic scenario, the pessimistic scenario is 12% less certain, and the optimistic scenario is 7% more certain, on average. Uncertainty metrics are integrated with data configuration measures, like the number of vein intersections and average three-hole spacing, to provide both geologic context, and construct a risk matrix supporting underground mine planning decisions.
Risk Uncertainty and Opportunity Identification
Information Effect Adjusted Uncertainty in Underground Mining
4 views